The Tainan Detention Center, as the first correctional facility in Tainan City, publicly tendered the solar photovoltaic installation project. Due to the high-security requirements at the site, the Tainan Detention Center had a strong demand for construction quality and reliability from solar energy companies. Ultimately, Ye Heng Energy, a subsidiary of Formosa Solar Renewable Energy Group, was awarded the project. The total installed capacity is approximately 2.13 MW, and it was successfully connected to the grid on December 31, 2022.
台南看守所戒護區屋頂
台南看守所戒護區屋頂
台南看守所戒護區屋頂
台南看守所戒護區屋頂